 The front railings are now in place. Some of the holes need to be filled as they were elongated to ensure that the railings were level.
The front railings are now in place. Some of the holes need to be filled as they were elongated to ensure that the railings were level.
Subscribe to:
Post Comments (Atom)
THE NEWEST POSTS ARE AT THE TOP OF THE PAGE ... Building the Aziz. A 1:50 scale model ship from the Model Slipway (see links). The model consists of a GRP hull, with fittings to be made from plasticard and pre-made parts of white metal and brass. I will be adding lighting and other detail to the build.
No comments:
Post a Comment